R.C.C. BEAM
1. MATERIALS
a. Cement:
Cement used
shall be of 53 grade for Birla super make. The cement should be fresh (within 2
months from the date of manufacture).
b. Coarse Aggregate:
Coarse aggregate
shall be of basalt stone. It should be well graded. The particles should be
angular and sharp. The aggregate shall be free from soft materials, organic materials, silt or other deleterious
material
c. Fine aggregate:
Fine
aggregate shall be river sand. It should be well graded. It should be free of
excessive amount of silt (not more than 8%). It should not contain organic
impurities. If the sand is wet it should be tested for bulking. If the sand has
bulked, extra sand shall be added of the required percentage volume. Crushed
stone can also be used as fine aggregate if allowed by the structural Engineer.
The amount of crushed stone used as fine aggregate shall be as per the
instructions of the Engineer.
d. Water:
Water used
shall be potable water. It should be free from organic and chemical impurities
and excessive amount of salt. If in doubt the water shall be got tested from
the laboratory.
e. Reinforcement:
The
reinforcement bars shall be TMT bars (Thermo mechanically treated). The grade
of the steel used shall be Fe415. Test report of the steel shall be obtained
from the manufacturer. The bars shall be free from excessive amount of rust and
scaling.
2. FORMWORK:
The formwork
used shall be made from timber planks or plywood. The props used shall be wooden bullies or
steel props. The formwork shall be so designed as to be water tight, strong
enough to take the loads from the materials, labour and vibration. The formwork
shall be so designed that the sides of the formwork can be removed after 24
hours without disturbing the bottom plank which shall be kept till the full
period of setting as specified. The props used shall be strong enough and
should be connected to each other by bracing.
3. PROPORTIONING:
The different
ingredients of concrete shall be mixed together by volume using a measure box
of 35 litres volume. Cement shall be
added as one bag of 50 kg, sand shall be added as 2 boxes of sand and course
aggregate as four boxes to get a proportion of 1:2:4. Water shall be added as per the water cement
ratio specified as per the following formula (water in litres = 50xwater cement
ratio) where 50 is the weight of one bag of cement in kg
4. MIXING:
All the
ingredients shall be mixed in a mechanical mixer. The mixer shall be turned for
a period of 1.5 minutes.
5.
COVER BLOCKS:
Cover blocks
of the required cover distance as specified shall be either made on the site
from rich mortar or may be of readymade plastic type. The cover blocks shall be
tied properly to the reinforcement so as to maintain the adequate cover
required.
6.
PLACING:
The cement
concrete mix shall be placed within the formwork in such a way as to avoid
segregation. The concrete shall not be dropped from a height exceeding 900mm.
Care shall be taken to see that the concrete covers all the reinforcement.
7.
VIBRATING:
The beam
shall be vibrated by means of needle vibrators and by roding. Excessive
vibration shall be avoided.
8.
CURING:
After 12
hours of casting the sides of the beam formwork shall be removed and the beams
shall be kept continuously wet by spraying water for a period of 14 days. If required the beams shall be kept covered
with gunny bags which shall be constantly wetted
9.
TESTING:
During the
casting minimum two test cubes shall be taken as per the procedure laid out in
Indian Standards. The cubes shall be cured and sent to the lab for testing.
Crushing strength of concrete shall be tested after 7 days and 28 days of
casting.
10.
Measurement:
The concrete
shall be measured in cubic meters. The steel shall be measured separately in
kg.