CERAMIC
TILE FLOORING
A.
MATERIALS
1. Cement : Cement used shall be 43 grade cement of ACC or
Ultra Tech brand. The cement shall be fresh (not more than two months old from
the date of manufacture)
2. Sand: Sand used shall be river sand, well graded and free
from excessive amounts of silt, organic and chemical impurities
3. Ceramic tiles: Ceramic tiles shall be of ‘Kajaria’ make
of nominal size 600x600 of thickness
8mm, of first quality as per approved shade and design.
4. Plastic spacers: Plastic spacers as approved to be
used at the junction of tile joints
5. Joint filler shall be of ‘Roff’ make of the specified
colour
B.
TILE LAYOUT:
The tile layout shall be as per drawings and
instructions. The starting point for tiling shall be as shown on the drawing.
The cut tiles shall be adjusted as per the tiling layout.
C.
CLEANING OF THE CONCRETE SURFACE:
The concrete base shall be cleaned of all
loose material and dust.
D.
CEMENT MORTAR BEDDING :
Cement mortar screed in the proportion 1:4
shall be laid on the concrete base as per the thickness required to achieve the
level of the tiles. The level of the finished floor shall be marked on the
adjoining walls and shall be used as a reference to determine the thickness of
the mortar screed.
E.
WETTING OF THE TILES:
The tiles shall be kept immersed in water for
at least 2 hours before tiling
F.
NEAT CEMENT FLOAT AND FIXING OF TILES:
Pure cement should be mixed in water to
create a cement paste with the consistency of honey. This paste should be
spread over the surface of the screed and the tiles should be fixed on the
screed and gently tapped with the help of wooden mallet. The level of the tiles
shall be checked from time to time with the help of a straight edge and string
used for reference attached to a reference tile placed in the corner of the
room. Plastic spacers shall be fixed at the corners of the tile and the adjoining
tile shall be placed leaving a space equal to the spacer between the tiles.
G.
FILLING OF GROUT (JOINT FILLER)
After laying of the tiles the joints between
the tiles shall be filled with joint filler of the required colour.
H.
CURING AND CLEANING:
The finished surface of the tiles shall be kept continuously
wet for a period of minimum 7 days. After curing is complete the surface of the
tiles shall be cleaned with a dilute acid wash and then washed with plain
water.